| 1. | Designed capacity : 2 . 6 million tonnes per annum 设计容量:年处理货物2 6 0万吨 |
| 2. | The design capacity of the airport reached 24 million passengers per annum 机场在扩建后的设定容量达每年2400万旅客。 |
| 3. | " designed capacity : 1 . 50 million tonnes per annum t1 t2 after expansion 设计容量:年处理货物1 5 0万吨扩建后的一号及二号货运站 |
| 4. | The existing circumstances of design capacity of home power and its measures for improvement 我国住宅电气设计容量的现状及改进措施 |
| 5. | The airport railway extended overrun tunnel will enable the airport express and tung chung line to operate at full design capacity 机场铁路掉头隧道伸延段让机场快线与东涌线能以最高载客量运作。 |
| 6. | Both railways are forecast to reach full design capacity by 2014 , but provision for the project must be made in criii 预测两条铁路会在2014年达到最高载客量,但扩建工程所需的土地必须透过中区填海第三期工程填取。 |
| 7. | Mtrcl needs a further extended portion of 460 metres to allow the airport railway and tung chung line to operate at full design capacity 地铁公司必须把掉头隧道部分再延长460米,让机场隧道与东涌线能以最高载客量运作。 |
| 8. | The new plant has a designed capacity of 8 production lines , and by february 2001 , the initial 3 production lines will become fully operational 厂房之设计已共容纳八条生产线,预期到二零零一年二月,首三条生产线将会全面投产。 |
| 9. | And , in 2000 , there was 1 . 73 million tons of outselling products , whose exceeding part almost occupied the one third of designed capacity 即便在目前状况下,仅以2000年为例,工业港共外发钢材173万吨,超过码头设计能力近1 3 。 |